Storm drainage system upgrade in seven catchment areas – a project assigned to us by Miejskie Wodociągi i Kanalizacja w Bydgoszczy sp. z o.o. Under the project that we will complete by the end of 2020, we will carry out sewage cleaning, CCTV inspection, rehabilitation, and CCTV inspection after the completion of work for every catchment area. For this rehabilitation we are using Cured in Place Pipe lining, and it will cover pipes and sewage in diameter range of DN300–DN1200 and a length of 11.2 km, as well as multi-level sewers in a diameter range of DN200–DN1400 (18.2 km). In addition, we shall reconstruct 923 lateral drains. This is a PLN 29 million project carried out in six districts in Bydgoszcz.
Date: 2018-2020
Investor: MWiK w Bydgoszczy sp. z o.o.
Technology: CIPP